WEBVTT

00:00:00.000 --> 00:00:02.360 line:65% position:50% align:center size:92%
Set the spec. Don't bid on price.

00:00:03.350 --> 00:00:07.285 line:65% position:50% align:center size:92%
Before we commit engineering time to a
project, we need to know where our offer

00:00:07.310 --> 00:00:11.230 line:65% position:50% align:center size:92%
fits, who is involved, and whether there is
still a useful way in.

00:00:11.650 --> 00:00:14.750 line:65% position:50% align:center size:92%
Let's follow one real opportunity through
EM3A.

00:00:15.300 --> 00:00:19.660 line:65% position:50% align:center size:92%
Baltic East is a planned 900 megawatt
offshore wind project in Poland.

00:00:20.160 --> 00:00:24.460 line:65% position:50% align:center size:92%
Its onshore substation package includes
engineering, protection, SCADA,

00:00:24.540 --> 00:00:25.440 line:65% position:50% align:center size:92%
and commissioning.

00:00:25.760 --> 00:00:29.400 line:65% position:50% align:center size:92%
Those are concrete reasons for an industrial
engineering team to investigate.

00:00:31.033 --> 00:00:33.453 line:65% position:50% align:center size:92%
We've confirmed an illustrative
supplier profile,

00:00:33.793 --> 00:00:38.188 line:65% position:50% align:center size:92%
electrical and grid integration plus
industrial automation. We record

00:00:38.213 --> 00:00:42.688 line:65% position:50% align:center size:92%
the capabilities, markets and exclusions of
Each offering. This gives the AI

00:00:42.713 --> 00:00:45.073 line:65% position:50% align:center size:92%
a business context for assessing relevance.

00:00:46.273 --> 00:00:50.488 line:65% position:50% align:center size:92%
I use Discover to look for projects in our
target market, then open the project

00:00:50.513 --> 00:00:54.768 line:65% position:50% align:center size:92%
and inspect its evidence. The official
onshore substation round shows

00:00:54.793 --> 00:00:58.968 line:65% position:50% align:center size:92%
October 30th, 2026 deadline. The preliminary
schedule

00:00:58.993 --> 00:01:03.393 line:65% position:50% align:center size:92%
includes technical consultations for
selected bidders in early 2027.

00:01:03.933 --> 00:01:07.808 line:65% position:50% align:center size:92%
The FEED designer is already appointed, so
the route needs a precise qualification

00:01:07.833 --> 00:01:08.553 line:65% position:50% align:center size:92%
check.

00:01:16.163 --> 00:01:20.538 line:65% position:50% align:center size:92%
Adding a project to Pipeline brings it into
an ongoing evidence workflow. The

00:01:20.563 --> 00:01:24.778 line:65% position:50% align:center size:92%
AI reads retained sources, checks for
changes, and helps structure project

00:01:24.803 --> 00:01:29.098 line:65% position:50% align:center size:92%
facts. Confirmed company context also helps
make company and contact

00:01:29.123 --> 00:01:33.438 line:65% position:50% align:center size:92%
research relevant. We can inspect the latest
outcome and see what still needs

00:01:33.463 --> 00:01:33.963 line:65% position:50% align:center size:92%
review.

00:01:35.183 --> 00:01:39.438 line:65% position:50% align:center size:92%
Three engines connect that evidence to a
commercial decision. Spec Influence

00:01:39.463 --> 00:01:43.638 line:65% position:50% align:center size:92%
Window, or SIW, examines timing for the
particular project or

00:01:43.663 --> 00:01:48.118 line:65% position:50% align:center size:92%
package. Dynamic Opportunity Score, or DOS,
checks a confirmed

00:01:48.143 --> 00:01:52.598 line:65% position:50% align:center size:92%
offering against the documented scope, our
criteria, exclusions, and technical

00:01:52.623 --> 00:01:57.058 line:65% position:50% align:center size:92%
facts. Signal Nexus retains source records
and associations, with a

00:01:57.083 --> 00:02:01.218 line:65% position:50% align:center size:92%
separate evidence advisory grounded in the
current business context. Each

00:02:01.243 --> 00:02:03.343 line:65% position:50% align:center size:92%
keeps unresolved evidence visible.

00:02:04.693 --> 00:02:08.928 line:65% position:50% align:center size:92%
Now I ask the project chat a practical
question. Which parts match our engineering

00:02:08.953 --> 00:02:13.188 line:65% position:50% align:center size:92%
offer and what must we establish before
committing resources? I can follow the

00:02:13.213 --> 00:02:17.348 line:65% position:50% align:center size:92%
answer back to its source, inspect the
requirement and carry that evidence into a

00:02:17.373 --> 00:02:18.773 line:65% position:50% align:center size:92%
more focused follow-up.

00:02:22.633 --> 00:02:26.928 line:65% position:50% align:center size:92%
The financial scale is real. ORLEN reports
loan financing of 900

00:02:26.953 --> 00:02:31.168 line:65% position:50% align:center size:92%
million zloty plus 397 million euros. That
is

00:02:31.193 --> 00:02:35.348 line:65% position:50% align:center size:92%
financing rather than a total project or
tender budget. Our own revenue

00:02:35.373 --> 00:02:39.953 line:65% position:50% align:center size:92%
potential needs an addressable scope,
quantities and a supported price basis.

00:02:40.153 --> 00:02:44.033 line:65% position:50% align:center size:92%
EM3A keeps that qualification separate from
the headline figure.

00:02:47.743 --> 00:02:52.018 line:65% position:50% align:center size:92%
Next, we look at the companies and people
connected with the project. Public

00:02:52.043 --> 00:02:56.518 line:65% position:50% align:center size:92%
procurement roles give us a starting point.
Source records and relationship status

00:02:56.543 --> 00:02:59.663 line:65% position:50% align:center size:92%
help us check the right contracting route
and decision owner.

00:03:00.703 --> 00:03:05.138 line:65% position:50% align:center size:92%
Research can also be scheduled. We can save
a weekly search for relevant grid

00:03:05.163 --> 00:03:09.183 line:65% position:50% align:center size:92%
and substation opportunities with duplicate
handling and delivery settings.

00:03:09.623 --> 00:03:13.643 line:65% position:50% align:center size:92%
A saved, paused schedule is ready to
configure. It hasn't run yet.

00:03:18.723 --> 00:03:22.958 line:65% position:50% align:center size:92%
As our team adds and reviews evidence, the
information compounds. The

00:03:22.983 --> 00:03:27.338 line:65% position:50% align:center size:92%
retained originals, reviewed requirements,
offerings and recorded associations

00:03:27.363 --> 00:03:31.943 line:65% position:50% align:center size:92%
become context for the next question. We
build on the work already done.

00:03:38.733 --> 00:03:42.928 line:65% position:50% align:center size:92%
The next move is specific. Qualify the
specialist engineering route and the

00:03:42.953 --> 00:03:47.208 line:65% position:50% align:center size:92%
available scope with an owner and a due
date. That turns research into

00:03:47.233 --> 00:03:48.933 line:65% position:50% align:center size:92%
something the team can act on,

00:03:51.553 --> 00:03:55.968 line:65% position:50% align:center size:92%
Bring one offering and one target market. On
the call we'll agree what a

00:03:55.993 --> 00:04:00.028 line:65% position:50% align:center size:92%
pilot should demonstrate, relevant projects,
evidence-supported timing

00:04:00.053 --> 00:04:04.408 line:65% position:50% align:center size:92%
and useful next actions. Book a call to plan
your EM3A

00:04:04.433 --> 00:04:04.973 line:65% position:50% align:center size:92%
pilot.
