Public-source example / Project brief 01

Northern Water — Mullaquana

A proposed desalination plant and transfer network. A useful starting point for a supplier qualification decision.

South AustraliaSource review: Editorial example

Prepared by EM3A from public sources. This is an editorial example, not a recorded EM3A run or customer result. It does not establish an open tender, product fit or a Spec Influence Window score. Project scope and procurement status may change after this review.

01 / Documented scope

What the reference design contains

The published assessment requirements describe a reverse-osmosis desalination plant, pipelines, pump stations, storage and electricity infrastructure. The reference design is preliminary and subject to change. [1]

Proposed output
51 GL/year [1]
Trunk pipeline
~360 km [1]
Branch pipeline
~46 km [1]

02 / Documented position

Design and procurement

The project website says high-level design is available and detailed design follows contract award. Construction depends on approvals and agreements. [2]

Two consortia are reported as shortlisted for a design, build, operate and maintain procurement process. This is not an invitation for new prime bidders. [3]

03 / Commercial interpretation

Investigate the fit

For a pump or electrical supplier, the published scope provides a reason to investigate. It does not establish that your products are suitable or that a package remains available.

Compare your technical offer and delivery capability with the relevant package. Confirm the procurement route and who controls that specification before committing sales effort.

04 / Recommended next review

Resolve the unknowns

  1. Check the latest project and procurement updates against this dated snapshot.
  2. Identify the relevant package and confirm its current decision stage and specification owner.
  3. Verify duty requirements, certifications and local supply or service expectations against your offer.
  4. Decide whether to pursue, monitor or deprioritize. Record the evidence and reasoning with the decision.

Not established by this brief

Keep the limits visible

  • Available package budgets or supplier revenue.
  • An approved start date or guaranteed delivery programme.
  • A named individual to contact, a product-fit score or a measured influence window.

Source register

Inspect the original material

  1. PlanSA — EIS assessment requirements, pages 4–6 ↗

    Released 30 June 2026. Project description, preliminary design and infrastructure scope. Publication and assessment record.

  2. Northern Water — About the project ↗

    Undated project page, reviewed 7 September 2026. Design sequence and dependencies before construction.

  3. Northern Water — Procurement and delivery ↗

    Undated project page, reviewed 7 September 2026. Procurement model and reported shortlist. External sources open in a new tab.